I recently saw a video in which a family first leveled the ground. Then basically tossed dry concrete on top. They then used a tiller to mix the concrete and dirt. Another person was sprinkling water over the top after it was all mixed they went back over and tamped (sp?) It back level.. Has anyone tried this? If so how many bags would be used for a 10x10 area?