Bradley Lochridge

+ Follow
since Nov 18, 2016
Merit badge: bb list bbv list
For More
Apples and Likes
Apples
Total received
In last 30 days
0
Forums and Threads

Recent posts by Bradley Lochridge

I am building a strawbale house in southern Arizona. It is quite dry and hot most of the year, so moisture is not typically an issues. The plans approved by my local county having Radiant floor heating. This is due to the county requiring that you have heating in every room.
I was originally planning on putting in a earthen floor (3 part native soil, 1. 5-1.25 parts water and 1 part chopped straw) as my base layer. My question or concern is I read here on Permies that someone had issues with the flooring being soft, too soft. Could I solve this problem by doing a Soilcrete (4 inches of native soil, 1/2 inch of concrete, mixed with a rototiller) for my base layer with the radiant tubing inside? My thought process is that the concrete may help stiffen the soil a bit but not too much. Still giving the floor a natural feel, with some back bone.
The base layer that I was intending to do would be 4 inches deep. Then on top of that I would put a finish lay of about 1/2 inch thick earthen flooring. The final lay would have several layers of boiled linseed oil applied.  The alternative is if i do a 4 inch base layer of soilcrete, and put a final layer of 1/2 earthen floor with linseed oil on top.
Oh plus if i did the soilcrete it would save me a lot of time and energy, as of now I would have to dig out my floor sift the soil, mix the soil in the mortar mixer add straw, and water. Then reapply the adobe mix to the floor.
If i went with soilcrete I would have to level the floor add concrete on top. Then take a rototiller and till the soil while adding water to the mixture.
What are you thoughts and Ideas?

Thank you
Bradley
8 years ago
I am not sure where you are living, but I am building a strawbale home in southern Arizona. It I very dry here, so Adobe dries fairly fast.  I put an Adobe mix on the inside of our little cottage. The 1st coat which was straw, native soil and water mixed in a mortar mixer. This 1st coat took about 24-48 to dry, a couple spot that were a bit thinker took a bit longer to dry.
8 years ago