Cristobal Cristo wrote:Josh,
Why was the graded pad not level at least within 10cm (4") envelope? I do not think it's good that you had to add 16" in a spot.
When grading I would ONLY build on cut section and also leave at least 3 m (10') graded perimeter around the house, so you would have space for paving, protection from water (or adding some trenching).
How are you compacting it? Gravel does not really compact much, because it does not have finer fractions.
What structure do you want build?
great. Thanks!Ben Skiba wrote:No i haven't had to water it.
Ben Skiba wrote:I live in the high desert as well. elevation 6,000 feet. we personally just put our humanure between 4 pallets with a metal mesh on top.
Anne Miller wrote: If I were in this situation I would have 2 wheelie bins with lids.
John C Daley wrote:What are you actually trying to deal with?
- Food
- septic waste
You have 3 other issues to deal with
- absence
- dry climate
- wind that is fierce and relentless.
Can you alter any of those last factors?
John C Daley wrote:What is" t1-11 siding" please?
I doubt the stick frame that size will move much, but is it braced?
What is the weather like?
Why 1 ft eaves, wider would be cooler?
Does the shack get hot?