Oren Shacham

+ Follow
since Dec 30, 2018
Merit badge: bb list bbv list
For More
Apples and Likes
Apples
Total received
In last 30 days
0
Forums and Threads

Recent posts by Oren Shacham

Hello everyone
I'm starting my first earthen floor project. It's going to be in a geodesic dome outside my house.
Right now the dome has a cover and is standing on the ground as it is.
My plan right now is to make it flat, pour in a layer of gravel and then pour the subfloor, and then floor layer and finishing.

I read in a book that "at the very least" the topsoil should be removed because its less stable.
Should i do that or can i just flatten the surface with the topsoil and go in with the gravel?

Thanks alot!
Oren
6 years ago