Hello and thank you Thomas!
I am excited to view the property and find out exactly what’s what. GPM and Head I did have in mind, although i’m not sure i’ll take GPM reading this time around, unless someone can suggest a very “easy” way of doing this, I may not have a lot of time to take these measurements, and we will be snowshoeing in to view the property. Timing the fill time on a known volume container i’m thinking will be difficult for just the first viewing. Thoughts?
From my understanding most of the property is on a very steep grade, with one ideal level spot for a camp/cabin. I am hopping that this dosent result in a situation where ideal build spot is a great distance from lowest point/hydro spot.
I’m for sure leaning towards a DC set up but I also like the ideal of selling power back to the grid which is only really possible with AC and federal permits (right?) which may be too big of a hoop to jump through, anyway i’m saying DC first then switching to AC and selling back anything extra would be the dream.
Thanks!!