Abigail Abts

+ Follow
since Sep 09, 2019
Apples and Likes
Apples
Total received
0
In last 30 days
0
Total given
0
Likes
Total received
1
Received in last 30 days
1
Total given
0
Given in last 30 days
0
Forums and Threads
Scavenger Hunt
expand First Scavenger Hunt

Recent posts by Abigail Abts

Awesome you guys, thank you so much for the insights! So happy I decided to come on here and ask before jumping into the project.

I will continue to study your posts, a lot of new knowledge there for me, which is great! I think I will have my dad (construction worker) read your posts and help me interpret and then hopefully come up with a plan.

Until then, thank you all so much for your guidance!
3 weeks ago

Mike Jay wrote:
So if I'm understanding you, there are two big beams that run the same direction.  And they roughly evenly divide the span of the joists?  So each joist is only going about 7-10 feet before it gets to rest on a beam or the outside wall?  If so, then they probably aren't undersized for the floor.  They're smaller than mine, but my joists have to support 14' of floor.

It's great you can remove the pvc, that will make sistering joists a bit easier.  If you can take more pictures of the joists in that area, we could give you some more ideas about how easily the floor can be beefed up.

Keep in mind, an earthen floor is adding weight so you may not want to do that until the floor support is fixed up a bit.  And in fixing the joists, the floor might move up or down a bit which could flex the floor coverings.  

Don't worry, we're here to help you figure this all out!



Thank you for the support!!

I’m back (finally) with some pictures.

Also, yes you understand correctly. I’ve just measured and it’s a little less than 7 feet between the exterior wall and on beam, about 9 feet from beam to beam, and then again about 7 feet from the second beam to the exterior wall.
1 month ago

Kenneth Elwell wrote:Everything Mike Jay said, and...Oh my gosh! That pipe drilled through the joists!!
So the rule is the hole can only be 1/3 of the joist depth and not within 2 inches of the top or bottom of the joist.



Yikes! Someone definitely did a number on these floors, huh. I hope I don’t ever find myself in a situation where I have to DIY my way through some plumbing, but you never know! If I do, I’m happy I know this! Thank you!
1 month ago

Mike Jay wrote:Hi Abigail, the beam (second picture) should be very strong so the floor right above that should be able to hold a lot of weight.  The smaller boards running perpendicular to them are the joists.  They look kind of small to me but it depends how long they are.  How far is it from the beam to the next beam or outer wall?

I guess irregardless of that, the two joists underneath where you want to put your RMH have been severely weakened by the plumber (or DIYer) who ran the PVC drain through them.  Those huge holes they drilled in the joists have pretty much ruined them.  I would be very worried about even having a bath tub above those two joists.  Empty tub would be ok but not filled with water.

I'd be tempted to have that PVC drain line moved down so it runs below the joists and then add a second joist alongside each of the existing ones.  It's called "sistering" when you add a joist to an existing one to strengthen them.  Sometimes it's easy to do, other times it's hard, depending on if there are wires or other things running through the joists.  If you can strengthen them, the floor should be strong enough for a bath tub, dance party, or earthen floor.  Maybe a RMH but it's hard to say..



Invaluable perspective, thank you so much! Upon inspection, the big PVC goes to an old vacuum system that doesn’t work anymore 🙄 so that can definitely be removed easily, and behind it there are also pipes that run from the water heater, so that maybe a bit more challenging, but I’m sure we could make it work!

So the joists run all the way across the floor, which I would say is about 25 feet. The big beam is about 7-10 feet from the exterior wall and about the same to the next big beam in the opposite direction (under the middle of the house).

I’m sure we will do some beefing up of those compromised joists either way, not the most comforting thought to have a weak infrastructure even if we aren’t adding weight upstairs. In the process of reinforcing those joists, could we do so in such a way that would make it more likely to accommodate the weight of a RMH?
1 month ago
Hello! I would very much like to build a rocket mass heater in my home for all of the lovely conveniences that come along with them. I recently bought Erica and Ernie’s book and have been reading through it. I’m here trying to collect information for my specific situation to see if one of these gems is a viable option.

My situation is as follows:

The main floor of my house, and where I’d like to put the RMH, is suspended over a basement with wood subfloors. The tentative plan is to install earth floors (because I love them) and also to build a rocket mass heater where the current wood stove is. It is important for me to admit that I am not a construction worker, or an engineer, or an architect. I’m pretty generally inexperienced at the ripe age of 22. I do have access to family members who have worked in construction their whole lives so I’m not at a total loss.

I understand that all that earth is going to be heavy. I also understand that wood is combustible. The Wisner’s book outlines a similar example where the homeowners built the actual stove part of the heater up away from the wood floor that they wanted to preserve on “feet or air channels”, and I believe also reinforced the infrastructure of the wood floor. With an 8”x8” beam under the stove, and piers 🤷‍♀️

Looks similar to my situation in a couple ways. Even though we want to put earth floors over the wood subfloors, is 3/4” to 1” of clay, sand, and straw enough of a barrier to keep the wood underneath it cool, or would it be a good idea to put the stove up on air channels? I have observed the structure holding up our floor and I see two huge beam and lots of smaller beam things running across the big beams. I’ll add pictures so you can see. There’s also a wall directly under where it would be very convenient to put the mass part of the heater.

Thanks for taking time to read my situation, any advice is welcome, and I’m happy to clarify!
1 month ago