Ty. Not trying to sound like an @$$ but at this point I've been saving to do this right so money is not an issue for this project. I am a fan of over egnineering. I don't have the time to do it 2ce so I need to do it right. I am just not sure which is the "better" or ,"correct " way. I originally bought enough posts to go 8ft a part. Then I read it's better to go 30-50ft a part with electric wire. So I drilled in 9 post for the moment. I have 4000ft of 12.5g wire, like 300 post line insulators and 30 tensioners. No springs or setup for gates but I'll figure that as I go. If I need more tensioners I'll order. If repairing would be a pain on a single line I won't have the time to fix it. And these stubborn goats will deffinelty take advantage.