Hi there!
I'm a structural engineer and you can construct your Rubble Trench Footer with Rammed Earth Wall but isolate Rubble Trench with a 6" concrete layer, use at least 2 rebars #4. Isolate appropriately the concrete layer and now you are able to build Rammed Earth Wall.