Thanks ilchianti and Dale for your replies already. Yeah the four foot skirt is normal for these foundations and the slope too but most drawings show them horizontal yet in practice its not. Was trying to be as accurate as poss. lol. I redrew my foundation adding in footings and drainage, also a toe up for the bale width difference, can also chase wires through it, one option as I want bales off the floor.
Dale that permafrost thing, got me upset all the trapped methane is coming out, its scary stuff, those poor people with their buildings up their, I would be moving asap. I like the rubble trench but worried about code. But say I could, how would you insulate it, similar to the ICF??
My other question now is do I insulate under the footings too? I or above the toe up and I guess I
should start talking to some ICF companies, any suggestions?
Radon gas, I remember when I took my trade at college in carpentry construction something about having to include a pipe for the radon gas to vent think it ran from the ground all the way out of the roof. Yeah it can kill too if you don't. For the water table issue, I plan on catching the rainwater to harvest and will have 4 ft over hangs, a clay soil, gravel, french drain and maybe the insulation will help as you say for run off, another benefit, cool!