This is a badge bit (
BB) that is part of the
PEP curriculum. Completing this BB is part of getting the
wood badge in
earthworks.
For this BB, you will make dry stack steps!
Minimum Requirements:
- at least five steps
- at least 2 feet wide
To get certified for this BB, provide proof of the following as pictures of a
video (<2 mins):
- equipment and materials at the build site
- partway through the build
- completed dry stack steps that meets the above minimum requirements