• Post Reply Bookmark Topic Watch Topic
  • New Topic
permaculture forums growies critters building homesteading energy monies kitchen purity ungarbage community wilderness fiber arts art permaculture artisans regional education skip experiences global resources cider press projects digital market permies.com pie forums private forums all forums
this forum made possible by our volunteer staff, including ...
master stewards:
  • Carla Burke
  • Anne Miller
  • Nancy Reading
  • John F Dean
  • r ransom
  • paul wheaton
  • Timothy Norton
stewards:
  • Jay Angler
  • Pearl Sutton
  • Andrés Bernal
master gardeners:
  • Christopher Weeks
gardeners:
  • M Ljin
  • Thekla McDaniels
  • May Lotito

Solar-pump water records: a free low-flow meter checklist from Much Solar

 
Posts: 6
  • Likes 4
  • Mark post as helpful
  • send pies
    Number of slices to send:
    Optional 'thank-you' note:
  • Quote
  • Report post to moderator
Sharing this on behalf of Much Solar, a solar-equipment supplier. We publish free buyer-oriented guides, and this one may be useful when planning water-volume records for a solar-powered irrigation or borehole pump. The linked page is on our commercial website and includes product links.

Before ordering a flow meter, try writing down the lowest flow you need to measure and what the record must show: a momentary flow rate, a daily volume, or discharge during a pumping test. Those needs can lead to different checks.

A short worksheet for the meter supplier:

1. At the lowest expected flow, what accuracy or error limit is actually specified for this exact size and model? A display starting to move only shows that it has detected something; ask for the measurement specification too.

2. If the meter uses Q3 and an R ratio, calculate Q1 rather than comparing R alone. For an entirely hypothetical example, Q3 of 4 cubic metres/hour divided by R of 160 gives Q1 of 25 litres/hour. An assumed 10 litres/hour would fall below that boundary. This arithmetic is not a pump test or a prediction of how much water any meter misses.

3. What happens at low-flow cut-off, during power loss, or when a measurement is invalid? Ask which events affect the display, the output and the totalizer. A zero reading needs to be interpreted using the actual configuration.

4. Where will the meter sit? Check the selected instrument’s pipe-fill and installation requirements. A meter on the outlet of a storage tank records tank delivery, which may occur at different times from the pump filling it.

5. For a daily record, keep opening and closing totalizer readings with timestamps and note resets or missing periods. Check how the meter stays powered and preserves its reading when the solar pump stops.

Our longer reference, with links to OIML, Kamstrup and Endress+Hauser material:
https://muchsolar.com/solar-pump-flow-meter-minimum-flow/

The guide supports questions to ask a supplier; it does not select or calibrate a meter, establish sustainable borehole yield, or replace the installer’s and test professional’s assessment. This post was prepared with AI assistance and checked against the linked guide; no first-hand installation or field-test experience is claimed.
 
Arvin Dale
Posts: 6
  • Mark post as helpful
  • send pies
    Number of slices to send:
    Optional 'thank-you' note:
  • Quote
  • Report post to moderator
A companion note for the water-record checklist: keep the solar-array calculation with the pump record, not just the panel count.

Much Solar's free solar pump tools cover listed Much Solar pump/controller models and specific panel entries. Save all three inputs—pump model, rated power and selected panel—alongside the complete result row: panel quantity, series × parallel arrangement, PV power, string Voc/Vmp and array current. Each row is an alternative, not an extra array to add to the others.

For comparing quotations, also keep the actual pump/controller and module datasheets. A panel with the same wattage is not necessarily electrically equivalent. If your exact equipment is not listed, don't select the nearest-looking option and assume it fits. Final temperature, current and controller-limit checks belong with the equipment supplier and a qualified installer.

This is an equipment-matching aid, not a prediction of daily water output. The supporting head tool uses a simple distance allowance, not detailed pipe-friction calculations; its flow figure is the demand entered, not measured delivery. Keep those estimates separate from the meter readings discussed above.

Disclosure: I represent Much Solar. This update was prepared with AI assistance.
 