Today I did a few random odds and ends to get things moved along. There was some wood processing, a bit more work on the sawmill, and a sign installed for Cooper Cabin.
After finishing up the bearings for the sled yesterday, today I replaced the bearing on the mill head. The other ones are for moving the blade to make cuts, and these are for adjusting the head to make different size cuts. A few of them were not rolling smooth, so I replaced them all. At some point this week I will try cutting a log and see if there needs to be any more work on the sawmill site for loading and securing logs, but for now just about everything else is ready.
Along with some wood splitting earlier, we cut some pieces down to length to bring to basecamp for firewood. We got a pole for the Cooper Cabin sign and dug a hole with the auger. Things went pretty quickly and we made it back from the lab with plenty of daylight left to get some other tasks done to prepare for the week.
The day started off with a check of the vehicles. Snow tires had been installed the week prior, and we wanted to make certain the wheels were holding air pressure. There was something else I wanted to investigate that turned out fine, but might be something to look out for if someone is new to swapping out wheels. The RAV had alloy wheels and is now running stamped steel rims. Fortunately, after removing one of the lug nuts I found that it had both a flat surface (along with a captured washer) for the alloy wheels, but also a conical end for the steel wheels. Some lug nuts for alloy wheels are not conical at the end, and will not properly torque down and hold a steel wheel on a vehicle. I went ahead and double checked that the wheels were torqued to spec anyway, and the air pressure in all of the vehicles, including the front tractor wheels, were good.
After that, we rode out to the Lab. We brought a new carbon monoxide detector over to Dogstar, and then made our way to the Abbey. We got a number of small tasks out of the way, and started loading up wood for the shop which was getting quite low. Before we left, we ran in to Stephen across from the Solar Leviathan and got some wood for the classroom.
After lunch, Esteban and I took out the instant water heater under the kitchen sink and poured out the water which was loaded with calcium buildup. We filled it with vinegar and left it for a few hours to loosen up more of the calcium.
After that we stopped by the library where I had found a manual hydraulic log splitter buried behind some tools. We took it to the classroom where we had unloaded some larger wood chunks before lunch and proceeded to split up everything we could. I got a few people working in the shop to come over and give the wood splitter a try so they could see for themselves. We got a lot of big pieces split down a bit.
Before the end of the day we headed back to the house to shake out the vinegar and more calcium debris from the water heater. It seemed to work really well. We also removed the screen from the end of the faucet to get chunks out of there, and after reinstalling the heater, the water was flowing normally again. I ran it for a couple minutes to get the remaining vinegar out and left it to heat back up. I got in a few more minutes in the shop to clean, organize, and label a few odds and ends before the end of the day.
Hi Daniel. Thank you for starting your own thread with photos. I like to follow you, Boots, and the work you are doing. I did see you in other Boot's threads, and in a video with Paul. But of course a personal thread is the best!
"Also, just as you want men to do to you, do the same way to them" (Luke 6:31)
This morning started out with a few stops around the Lab. We took a quick stop at Bartel's so people could see what had been going on there recently, and then we headed out to the root cellar site. I had recalled reading some time back before coming here that a tree jack had been lost, and today we found it! In our search for the log arch, we came across the tree jack, a couple of chains, a log peeler, and a log carrier. We brought the bounty of tools back to TRob up at the road and continued on to the Abbey.
The bulk of my morning was spent hauling logs left over from rebuilding fences this summer and carrying them next to the front gate for further processing. I could probably spend a week just doing that job. I tried to focus on the bigger pieces that would be worthwhile to have for firewood, leaving smaller pieces for another day if we manage to get them before any possible significant snowfall would make that a less desirable task. There was a tiny bit of looking ahead at tasks for the near future, but most of us have been motivated to get a lot of wood processing done sooner rather than later.
After lunch, it was back to the Abbey to harvest a final post for the backyard fence project that is nearing completion. Plenty of more fences will be built for more paddocks, but for now we want to keep deer out of the backyard. Everyone's skill level at building the rock jacks and junk pole fences has increased dramatically since I have been here. Everyone has been taking it seriously and communicating things that work or don't work for them, and we have found solutions for most potential problems. The results speak for themselves.
After harvesting what we needed, I stopped by the sawmill to install the blade on the mill head. The driveshaft needs a tiny bit of adjustment to get the blade in line with the riving knife, and may need a tiny bit of adjustment to get it parallel to the rails so it cuts straight without burning the wood. I haven't yet tried to load a piece of wood, so I haven't begun to flesh out exactly what might be good ideas for changes or upgrades to the old setup yet beyond a bit of conversation with Paul. I will have to bring a tiny bit of coconut oil out there to clean the blades to avoid sap buildup creating hot spots that warp the blade. There will be more to come on this project in the coming days.
We headed back to basecamp for the last hour, unloaded tools and firewood, and brought the post and a few other fence piece to the backyard fence area. We then headed back to the classroom and took turns on the log splitter. We managed to get through a good bit of the wood before the end of the day.
This morning I went over to the sawmill site and got the millhead properly set up and installed on the sled so it could cut wood. We helped Stephen get a log moved over to the site and up on to the crib ready to cut. The saw sounded significantly smoother than it did the last time I tried it out thanks to the new bearings.
Unfortunately it has been very rainy for days and the battery only had a limited amount of energy before cutting out on us. It wasn't until we were heading back to basecamp that the sun finally came out for the first time in days. Hopefully that harvests enough power to get more done with it soon. It's supposed to be pretty cloudy for the next week.
Once back at basecamp people were working on various projects in and around the shop. Splitting wood, cutting pieces for making stools, and sign making. A lot of progress was made in the short time left before lunch.
After the post lunch meeting, we started making stools and repairing chairs. We broke up in to pairs and were all successful at making a stool. A couple of chairs in need of tightening got snugged up. Stephen pulled apart log chair that needed more attention. We made pig in blankets and watched an episode of The Woodwright's Shop. We managed to get a lot done while having a great time today.
This morning started out with some snow flurries coming down. After the morning meeting they were coming down a bit more consistently, and steadily increased by a tiny bit until right before lunch. We got some work done on the junkpole fence frame so people in the afternoon could fill in the junkpoles. The fence has gotten to the point where we don't need so much metal fencing to keep the deer out, and it can soon be stored away as we shouldn't have an immediate need for it anymore.
After lunch there was a flurry of activity in the shop. Among the many things that went on was bringing a cordless circular saw back to life. It still has the original blade in great shape, but the old nickel cadmium battery had long since expired. A while back I had tested it out with a Makita 18V battery, but hadn't made a way for it to properly attach to the saw just like it does on the Makita cordless tools. I found a burned out drill in the repair cafe and managed to make the base of that and the old Skill battery case in to a battery adapter.
While I was going through the repair cafe, I saw an extension cord in need of a new end, with a box of new ends right next to it. I spent a few minutes cleaning up the ends of the wires and getting the cord back in to service.
Among a bunch of other battery repair tasks I got involved with, the easiest and most successful of them was finding a Makita battery that had the main positive wire break free from the tab it was soldered to. I used another Makita battery with my soldering iron that I made portable and quickly repaired the problem. The cell voltages were fine and it ran and charged up without issue. We've had a few Makita batteries fall out of service in the past few weeks, so it is good to finally have one I could easily get back in the rotation.
IMG_20261119_094147110.jpg
A bit of snow accumulating on the framing members
IMG_20261119_104915317.jpg
Another section framed
IMG_20261119_145126223.jpg
Another circular saw in action definitely feels great!
Today we went out to the sawmill site. We took a look at the cord situation to look at potentially running the sawmill off of TRob. After getting the millhead in place, it immediately had the belt break off. The key for the drive cog was not in great shape, and neither was the belt. Unfortunately with the key so beat up, there was no easy way to get the cog back in place and have the grub screw grab on to the key to keep things in place. Besides doing a few minor odds and ends at the lab, we ended up heading back to basecamp before lunch.
With the extra time to get something done, I decided to make a simple round mallet. I cut down around the perimeter in a spot that left sufficient area for a handle, and then removed the bulk of the material by drawing a circle on the end and tapping a hatchet with a hammer along that line. After making it all the way around, I smoothed out the facets and shrunk down the middle a bit using a draw knife.
After lunch we went out to the lab to set up a couple sign posts and dig out rotten wood from the rear wing wall at the Abbey. The earth is fairly heavy in clay with big chunks and the post bottoms are over two feet in the ground to be dug out. We have some replacement posts cut and ready to be buried with gravel socks to help keep them from rotting. Once those are solidly in place we can move along the trench we dug and install posts and remove others until we get to the end near the back door. After that, we will have to reinforce the overhang and replace the post supporting that, as well as the retaining wall pieces at the end, as everything is severely rotten.
IMG_20261120_092742584.jpg
Sawmill plug in the Leviathan is different than TRob
After getting a lot of use from the wood splitter in the classroom, many of us wanted to reclaim space that had slowly been lost over time. Between the wood, the outdoor sinks that were brought in, and a number of other items taking up a huge hunk of space, things had become a bit awkward to work around. I talked with Joules about my ideas and when I returned from the Abbey, things had been moved to the berm shed or organized to make the classroom much more usable.
At the Abbey we removed a posts with rotten bottoms, and pulled a lot of dirt out from the trench. We have a game plan to fill the trench back in with gravel around the posts. Using cardboard as a temporary separator, we can back fill the rest of the trench with the soil removed to give us enough room to work, As we add material to each side of the cardboard, we can pull the cardboard up a bit and keep filling without wasting a bunch of gravel on the large trench.
After lunch we worked on the junk pole fence. Getting the last vertical in when it sits on the edge of two panels can be difficult to get right. We ended up removing the one from the end of the previous panel to install a larger vertical to make things work. Once installed, the rest of the verticals on the next section were added. The next panel will go on the opposite side because the final rock jack faces the other direction to accommodate the existing tanglefoot fence. We had to select specific diameter verticals to work with the larger vertical at the end of the last panel, and then install the third horizontal. There were a lot of details and cuts to make, but it went surprisingly fast. Afterwards I made my way back to the shop to do a bit of clean up and split more wood in the classroom before heading to the house for Taco Tuesday.
After talking with people yesterday, this morning I introduced Wandom Wednesday. For one shift some of us are going to focus on one of the major tasks that need to be accomplished and have others working nearby in case we need a hand, to keep people up to date on the major task, or to rotate people out so everyone gets a chance to be hands-on with the task. I talked to others to figure out what would be the best path to take, and we chose to go to the Abbey to continue the wing wall repair project while others harvested pieces for the final junk pole fence to complete the fence replacement around the backyard paddock.
Things went well for both teams. All of the pieces needed were harvested, and then people worked on the sing and post replacement in front of the Abbey. My team did a lot of shoveling to get the trench ready for filling in with the new posts and gravel. First we had to find a new home for all of the earth excavated to make room to work, as well as tossing the rotten wood on to hugels to add organic matter to them.
After lunch I spent most of my time helping others get set up or move forward with their projects. It didn't take much to keep everyone's momentum going. I cut some wood on the table saw, split wood with the log splitter, and raked up the trail around the outside of the backyard fence because too many times people have fallen or nearly fallen stepping on loose rocks or other debris.
IMG_20261125_084119652_HDR.jpg
Roy loaded for work at the Abbey
IMG_20261125_090628080.jpg
Beginning to clean up behind the ABbey
IMG_20261125_112437043.jpg
Things cleaned up
IMG_20261125_161233236_HDR.jpg
Ripping wood with the tablesaw
IMG_20261125_170545221.jpg
Trail cleaned up
Trees are our friends
The Humble Soapnut - A Guide to the Laundry Detergent that Grows on Trees ebook by Kathryn Ossing