Hi All;
I replaced the original secondary air tube in our greenhouse batchbox late last season, it had spalled down to unusable condition.
At that time I installed the original prototype Dragontech quick change secondary supply tube in its place.
Yesterday in 15 minutes I replaced the carbon steel riser stub with a new one!
Simply twist and lift the old degraded stub out and drop in a new one!
15 minutes included cleaning all the ash from the firebox .
With my Dragontech design door I was able to simply slide the secondary tube back 6-8" .
This facilitated removing the ash build up in the slotted port entering the riser.
With all the ash removed the air tube slid right back into place without ever removing the door!
Unfortunately I made this repair early in the morning and did not take the time to document the process.
It really couldn't have been any faster or easier!
We burn that rocket hot , nonstop all day everyday from September- April or beyond.
I expect to change the riser stub again before the end of burning season.
At $5 or so for a replacement stub I can do this as many times as needed.
Or for $80 or so I could use a RA330 stub from Dragontech and never need to replace it again!
20211113_105108.jpg
20211113_105046.jpg
20211113_105122.jpg
20211113_105129.jpg
For all your Montana Masonry Heater parts (also known as) Rocket Mass heater parts.
Visit me at
dragontechrmh.com Once you go brick you will never go back!
Hi All;
I installed that "new secondary air stub" on November 12th 2021.
As of today, Feb 25th 2022 it's shot,
My photo show's its current condition.
This batchbox sees severe use. It runs non stop apx 12hrs a day all winter.
3.5 months is a reasonable time to expect a piece of plain steel to last at those temperatures.
With my quick change secondary tube.
It will take just a minute to change that worn out part with a new replacement.
A standard 6" long piece of 2" schedule 40 pipe is around $5
I have decided to replace it with a stub of high heat RA330 at $80 .
Time will tell, but I expect this to be the last stub I ever need.
I will update photo's at the end of burning season this year and again Mid burn season next year.
20220226_001038-(1).jpg
After 3.5 Months at 2000F
For all your Montana Masonry Heater parts (also known as) Rocket Mass heater parts.
Visit me at
dragontechrmh.com Once you go brick you will never go back!
Approximately 10 minutes including ash cleanout from start to building a fire.
20220226_084129.jpg
plain steel & RA330
20220226_084149.jpg
Ready for new stub
20220226_084214.jpg
RA330
20220226_084456.jpg
A smooth takeoff
20220226_104909.jpg
Full burn
For all your Montana Masonry Heater parts (also known as) Rocket Mass heater parts.
Visit me at
dragontechrmh.com Once you go brick you will never go back!
Hey Thomas;
It is 100% as good as the day I installed it!
I liked it so much that I bought another for my shop stove.
For all your Montana Masonry Heater parts (also known as) Rocket Mass heater parts.
Visit me at
dragontechrmh.com Once you go brick you will never go back!
Here is the RA330 this season, still perfect and expected to stay that way.
The last picture is nothing but steam and snow on the mountain.
20221024_194258.jpg
20221024_194309.jpg
20221023_115215.jpg
For all your Montana Masonry Heater parts (also known as) Rocket Mass heater parts.
Visit me at
dragontechrmh.com Once you go brick you will never go back!