I had rash all over my body on the Calgary site. So I had to switch site. Now I have moved to a site north of Edmonton, which is colder than Calgary. This Dixon Model combines everything in one design to face the hush challenges we have on the building site: no power, no
water, no
shelter, only an empty farmland with
hay uncut.
This new building site is located in Redwater, AB, Canada, which belongs to the Sturgeon County in the province of Alberta. This drone video shows the building site in more detail - it also shows two large
solar panels to charge a 3 kWh power unit and a RV trailer (with the fridge turned off, I have
enough power to use, even during cloudy days):