posted 2 days ago
B.E.L. Post # 26
After the morning meeting, little Chapito and I headed over to the Love Shack to fire up the rocket mass heater and get things warmed up for the day.
Once that was going, we met up with Stephen and Zach at the shop and made our way to the Abbey for the usual cat-feeding and a full fence perimeter check. Everything looked good out there.
Back at Basecamp, we got to work cutting a couple more trees to use as material for the lean-to shed. Before we could start building, we split the 8-foot sections in half, loaded them up, and headed up the property. We spent the next stretch putting the lean-to together—solid progress and it’s coming along nicely.
Wrapped up the day with some cleanup work, wiping down and vacuuming a couple of the vehicles before calling it good.
Another full day, but a good one.
20251113_082444.jpg
20251113_082737.jpg
20251113_100948.jpg
20251113_105035.jpg
20251113_113246.jpg
20251113_114834.jpg
20251113_153516.jpg