installing the plywood mounting board with blocking behind it {60 minutes}
Jim Garlits approved this submission.
Note: Allen, the minimum requirements for this BB are to install a powerwall, follow local codes, and do 90 percent of the work. You showed the parts of the system. You showed multiple points of the installation. There was a clear description of the system components and how they work together. And you showed the final installation. And it wasn't an out of the box Tesla powerwall! I applaud you for being the first (it appears) to get this BB. I wouldn't hesitate to hire you to work on my own home electrical.
|
So then I told Joseph Stalin to piss off! Remember that tiny ad?
A rocket mass heater is the most sustainable way to heat a conventional home
http://woodheat.net
|