• Post Reply Bookmark Topic Watch Topic
  • New Topic
permaculture forums growies critters building homesteading energy monies kitchen purity ungarbage community wilderness fiber arts art permaculture artisans regional education skip experiences global resources cider press projects digital market permies.com pie forums private forums all forums
this forum made possible by our volunteer staff, including ...
master stewards:
  • paul wheaton
  • Anne Miller
  • Carla Burke
  • Nancy Reading
  • John F Dean
  • Timothy Norton
  • Jay Angler
stewards:
  • r ransom
  • Pearl Sutton
  • Tereza Okava
master gardeners:
  • Christopher Weeks
gardeners:
  • M Ljin
  • Megan Palmer
  • Kate Downham

!! In the quiet hours of the bootcamp grind, I found myself: Esteban's Bootcamp Experience

 
pollinator
Posts: 434
1340
  • Likes 10
  • Mark post as helpful
  • send pies
    Number of slices to send:
    Optional 'thank-you' note:
  • Quote
  • Report post to moderator
Yesterday (04/06/2026) after our morning meeting, we all gathered at the shop, grabbed our tools, and headed out to the lab. From there, we split into two crews. Seth took Caroline, Derek, and Fatty over to the sawmill site, while I teamed up with Rodger and Melissa.

Our crew made our way to the woodshed near the tipi site, where a good pile of logs was already staged and waiting. We got right into the rhythm of bucking, splitting, and stacking. There’s something satisfying about falling into that steady flow—chainsaw, maul, stack… repeat. Once we had everything processed, we hauled the firewood over to the Abbey’s rack and got it neatly stacked up for future use.

After wrapping that up, we headed back and linked up with Seth’s crew. Following lunch, we all shifted gears and made our way to the Abbey to continue working on the junkpole fencing. Progress is really starting to show there.

Later on, Melissa and I broke off and headed to Cooper Cabin to get things ready for a sepper arriving Wednesday. While Melissa worked her magic inside—cleaning, organizing, and bringing that welcoming touch—I stayed outside and got some firewood handled. More bucking and splitting, making sure the cabin would be well-stocked and ready.

Once everything was squared away, we made our way back and rejoined the rest of the crew to close out the day.

Another solid day of teamwork, steady progress, and taking care of the land and spaces that take care of us.
20260406_095026.jpg
Rodgers, Melissa and I by the Tipi site
Rodger, Melissa and I by the Tipi site
20260406_095327.jpg
Logs to be bucked, split and stacked
Logs to be bucked, split and stacked
20260406_103501.jpg
[Thumbnail for 20260406_103501.jpg]
20260406_104428.jpg
[Thumbnail for 20260406_104428.jpg]
20260406_105329.jpg
Loaded up to be transported to the Abbey
Loaded up to be transported to the Abbey
20260406_161052.jpg
[Thumbnail for 20260406_161052.jpg]
20260406_161148.jpg
[Thumbnail for 20260406_161148.jpg]
20260406_161152.jpg
Chapito decided to help as well lol ...
Chapito decided to help as well lol ...
 
Esteban Ademovski
pollinator
Posts: 434
1340
  • Likes 9
  • Mark post as helpful
  • send pies
    Number of slices to send:
    Optional 'thank-you' note:
  • Quote
  • Report post to moderator
B.E.L. Post # 132

After the morning meeting, we gathered our tools and headed down to the lab. I dropped the crew off at Cooper Cabin, where they got to work sprucing things up in preparation for the sepper arriving tomorrow. While they handled that, I made my way out to the sawmill site.

Out there, I bucked four logs down to length and hauled them back to Cooper so they could be split and stacked for future use. Once that was squared away, I rejoined the crew.

After lunch, we shifted gears a bit. I had Caroline, Derrick, and Fatty working on debarking two junkpole trees for the tipi gate project—good steady progress there. Meanwhile, Seth and I took some time to perform maintenance on the chainsaws, making sure everything’s dialed in and ready for continued use.

To close out the day, we all headed back to the Abbey and put in work on the fences until the end of the boot.
20260407_092656.jpg
Bucking some logs from the sawmill site ... to be brought over to Cooper Cabin
Bucking some logs from the sawmill site ... to be brought over to Cooper Cabin
20260407_094700.jpg
Action shot
Action shot
20260407_100306.jpg
Done... will be brought to Cooper Cabin... to be split and stacked over there
Done... will be brought to Cooper Cabin... to be split and stacked over there
20260407_134905.jpg
Chainsaw maintenance
Chainsaw maintenance
20260407_135129.jpg
[Thumbnail for 20260407_135129.jpg]
20260407_143332.jpg
[Thumbnail for 20260407_143332.jpg]
20260407_152847.jpg
[Thumbnail for 20260407_152847.jpg]
20260407_160623.jpg
[Thumbnail for 20260407_160623.jpg]
20260407_180039.jpg
[Thumbnail for 20260407_180039.jpg]
 
Esteban Ademovski
pollinator
Posts: 434
1340
  • Likes 12
  • Mark post as helpful
  • send pies
    Number of slices to send:
    Optional 'thank-you' note:
  • Quote
  • Report post to moderator
B.E.L. Post # 133

Today kicked off with our morning meeting, then we all piled into Toots and headed down to the lab. I dropped off Melissa and Carol at Cooper Cabin so they could keep working their magic—getting the place dialed in, cozy, and ready for Jesse’s arrival. It’s been cool seeing that space slowly transform into something really welcoming.

The rest of us made our way to the Abbey to keep pushing forward on the leaning junkpole panels. During the morning boot shift, I focused on harvesting materials for the rebuild—cut down about 10 trees, each roughly 30 feet long, that’ll be used as horizontal pieces. Got them all delimbed and ready before switching gears.

After that, I moved over to the Tipi gate project and started digging out the footing. Kept at that until lunch, then after we ate, we got back out there and started on the holes for the vertical posts. We used the electric auger Paul picked up earlier this year—made a big difference and definitely sped things up.

We kept at it through the second half of the boot day and made some solid progress all around. Feeling good about how things are coming together.
20260408_090900.jpg
Seth feeding the cats at the Abbey
Seth feeding the cats at the Abbey
20260408_094707.jpg
Some more digging for the Tipi footing
Some more digging for the Tipi footing
20260408_110205.jpg
[Thumbnail for 20260408_110205.jpg]
20260408_112220.jpg
Harvesting some woody trees for junkpole horizontal pieces
Harvesting some woody trees for junkpole horizontal pieces
20260408_135523.jpg
Melissa collecting buckets worth of gravel
Melissa collecting buckets worth of gravel
20260408_141410.jpg
Action shot
Action shot
 
Esteban Ademovski
pollinator
Posts: 434
1340
  • Likes 9
  • Mark post as helpful
  • send pies
    Number of slices to send:
    Optional 'thank-you' note:
  • Quote
  • Report post to moderator
B.E.L. Post # 134

Today was one of those steady, hands-on days where a little bit of everything got done.

During the first half of the day, Seth, Melissa, the wwoofer, and I were over at the Lab, rolling up our sleeves and debarking logs. There’s something oddly satisfying about peeling back that outer layer and watching the clean wood emerge underneath—good honest work, and plenty of it.

After lunch, Melissa and I shifted gears into fix-it mode. We tackled a wheelbarrow that had seen better days—the axle had popped out, but with a bit of tinkering and persistence, we got it back in working order. While we were at it, we also fixed up the air compressor hose, which felt like a small but meaningful win.

Later on, I dismantled a section of junkpole fencing out by the drive. One of the rock jack legs had given way, so it was time to take it down and reset things properly down the line. Always something to maintain out here.

We also got some potatoes planted, which felt especially good—putting something into the ground that’ll give back later. That kind of work never gets old.

I wrapped up the day by rehandling a rake, giving it a new handle and a second life. There’s a quiet satisfaction in repairing tools instead of replacing them—it just feels right.
20260409_093937.jpg
Will be debarking this log
Will be debarking this log
20260409_133310.jpg
[Thumbnail for 20260409_133310.jpg]
20260409_134142.jpg
[Thumbnail for 20260409_134142.jpg]
20260409_135127.jpg
[Thumbnail for 20260409_135127.jpg]
20260409_140008.jpg
[Thumbnail for 20260409_140008.jpg]
20260409_151611.jpg
[Thumbnail for 20260409_151611.jpg]
20260409_152445.jpg
[Thumbnail for 20260409_152445.jpg]
20260409_164621.jpg
[Thumbnail for 20260409_164621.jpg]
20260409_173225.jpg
[Thumbnail for 20260409_173225.jpg]
 
Esteban Ademovski
pollinator
Posts: 434
1340
  • Likes 9
  • Mark post as helpful
  • send pies
    Number of slices to send:
    Optional 'thank-you' note:
  • Quote
  • Report post to moderator
B E.L. Post # 135

After the morning meeting, Seth, Rodger, and I rolled out to the Abbey with Seth leading the charge as point. The mission: tame those leaning junkpole panels once and for all.

We felled another live tree and carved out two more 10’ posts—bringing our total to five solid posts ready for duty. With the post holes already dug from yesterday (huge win) and gravel courtesy of the rock “beautiful” project, we moved like a well-oiled machine and got all five posts set in place. Watching those panels stand tall again… chef’s kiss.

From there, we switched gears and dug up soil from an approved section of the property and stacked it onto a berm—because no day is complete without moving a little earth around.

After lunch, we split into teams and headed back out. First stop: the Abbey greenhouse for some much-needed watering. Then it was off to the sawmill site where our team was supposed to relocate staged logs and swap them with fresh ones.

Plot twist… the tractor had a flat front tire 😅 so that plan got parked for the moment.

Meanwhile, Seth’s team didn’t skip a beat—they dropped a big tree. As soon as it hit the ground, I headed over to jump in on delimbing and bucking. Nothing like the sound of a chainsaw and teamwork to keep the momentum going.

We wrapped things up back at basecamp, and I finished out the day on a smaller but satisfying fix—repairing a metal rake. Enlarged the retaining hole with a 3/8” bit, set a bolt to lock it in, and topped it off with a protective coating on all the wooden parts. Good as new and ready for more work.
20260410_085829.jpg
Gravel to be used for wooden posts
Gravel to be used for wooden posts
20260410_090632.jpg
[Thumbnail for 20260410_090632.jpg]
20260410_090715.jpg
[Thumbnail for 20260410_090715.jpg]
20260410_091518.jpg
[Thumbnail for 20260410_091518.jpg]
20260410_091918.jpg
[Thumbnail for 20260410_091918.jpg]
20260410_134833.jpg
Melissa watering in the greenhouse
Melissa watering in the greenhouse
20260410_141724.jpg
[Thumbnail for 20260410_141724.jpg]
20260410_155152.jpg
[Thumbnail for 20260410_155152.jpg]
20260410_155337.jpg
[Thumbnail for 20260410_155337.jpg]
20260410_155434.jpg
[Thumbnail for 20260410_155434.jpg]
20260410_170823.jpg
[Thumbnail for 20260410_170823.jpg]
20260410_171026.jpg
[Thumbnail for 20260410_171026.jpg]
20260410_171523.jpg
[Thumbnail for 20260410_171523.jpg]
20260410_171808.jpg
[Thumbnail for 20260410_171808.jpg]
20260410_173650.jpg
[Thumbnail for 20260410_173650.jpg]
20260410_183832.jpg
[Thumbnail for 20260410_183832.jpg]
20260410_184058.jpg
[Thumbnail for 20260410_184058.jpg]
20260410_185053.jpg
[Thumbnail for 20260410_185053.jpg]
 
I'm a lumberjack and I'm okay, I sleep all night and work all day. Tiny lumberjack ad:

World Domination Gardening 3-DVD set. Gardening with an excavator.
richsoil.com/wdg


reply
    Bookmark Topic Watch Topic
  • New Topic