Hey William, I realized that I never answered some of your questions about the stratification chamber.
The bed itself was all dry stacked blocks for the stratification chamber, and then I used a construction adhesive to hold the blocks above the chamber together. I used a 3M Fire Barrier mastic to fill the gaps between blocks, and then painted the blocks with ultra black latex paint. I would have liked to cover the blocks with plaster, but time didn't allow for that.
As far as the duct work is concerned, yep, you got it right. I ran fifteen feet of six-inch duct into the chamber, with a short piece of duct below that for the return. I cannot remember where I read the recommendation about the ducting but it made sense to push the heat into the chamber further before allowing it to actually fill the chamber.