This is a badge bit (BB) that is part of the
PEP curriculum. Completing this BB is part of getting the iron badge in
earthworks.
For this BB, you will create earthworks for preparing to build a second structure!
(source: Wofati 0.8 - Cooper Cabin
Minimum Requirements:
- flat where the structure goes
- sloped away from the flat to provide drainage
- possibly ditch on uphill side to move water away from structure
To get certified for this BB, provide proof of the following as pictures of a video (<2 mins):
- equipment and materials at the build site
- partway through the building the flat, slope, uphill side drainage ditch, and other earthworks
- completed earthworks to prepare a site for building a structure