• Post Reply Bookmark Topic Watch Topic
  • New Topic
permaculture forums growies critters building homesteading energy monies kitchen purity ungarbage community wilderness fiber arts art permaculture artisans regional education skip experiences global resources cider press projects digital market permies.com pie forums private forums all forums
this forum made possible by our volunteer staff, including ...
master stewards:
  • Carla Burke
  • John F Dean
  • Timothy Norton
  • Nancy Reading
  • r ranson
  • Jay Angler
  • Pearl Sutton
stewards:
  • paul wheaton
  • Tereza Okava
  • Andrés Bernal
master gardeners:
  • Christopher Weeks
gardeners:
  • Jeremy VanGelder
  • M Ljin
  • Matt McSpadden
  • Likes 1
  • Mark post as helpful
  • send pies
    Number of slices to send:
    Optional 'thank-you' note:
  • Quote
  • Report post to moderator
This is a badge bit (BB) that is part of the PEP curriculum.  Completing this BB is part of getting the wood badge in earthworks.

For this BB, you will create earthworks for preparing to build a structure!


(source: Allerton Abbey - Wofati 0.7)

Minimum Requirements:
  - flat where the structure goes
  - sloped away from the flat to provide drainage
  - possibly ditch on uphill side to move water away from structure

To get certified for this BB, provide proof of the following as pictures or a video (<2 mins):
  - equipment and materials at the build site
  - partway through the building of the flat, slope, uphill side drainage ditch, and other earthworks
  - completed earthworks to prepare a site for building a structure
COMMENTS:
 
Posts: 5
  • Likes 1
  • Mark post as helpful
  • send pies
    Number of slices to send:
    Optional 'thank-you' note:
  • Quote
  • Report post to moderator
Edge case submission

Building an almost “passive” greenhouse.  Had to add footings, dig huge trench which was a pond for weeks after “mid season” in VT, set sono tubes and concrete, and graded


“equipment and materials at the build site
 - partway through the building the flat, slope, uphill side drainage ditch, and other earthworks
 - completed earthworks to prepare a site for building a structure”
B5D83D79-893B-407F-94D4-C920E0869C0D.jpeg
Materials for “almost passive” greenhouse
Materials for “almost passive” greenhouse
3F2C617A-D8C4-4F6F-97D0-8206CBF60744.jpeg
Sono tubes for footings
Sono tubes for footings
7119212D-AFEA-470A-8A6D-BD1B2E057AC3.jpeg
Snowstorm. Need to pour footings.
Snowstorm. Need to pour footings.
1E0B6EF6-F3EB-4F3E-84C5-121A30767034.jpeg
Final grading.
Final grading.
Staff note (gir bot) :

Someone flagged this submission as an edge case BB.
BBV price: 0
Note: Please add a picture clearly showing the slope for drainage.

 