This is a badge bit (
BB) that is part of the
PEP curriculum. Completing this BB is part of getting the
wood badge in
Plumbing.
In this Badge Bit, you will install a cistern and pump house that is truly first
class. All components need to be winter capable for your area without using heat tape or other band-aids.
Here's a
video for the cistern part, there's probably one out there for the pump house portion :)
Minimum requirements to get this BB:
- cistern deep
enough to not freeze
- 500 gallon minimum capacity
- freeze protected pump and piping
To show you've completed this Badge Bit, provide proof of the following as pics or video (less than two minutes):
- the site before you start work
- cistern hole dug
- tank in place
- piping under construction
- piping done
- pump house done
- backfilled and finished