• Post Reply Bookmark Topic Watch Topic
  • New Topic
permaculture forums growies critters building homesteading energy monies kitchen purity ungarbage community wilderness fiber arts art permaculture artisans regional education skip experiences global resources cider press projects digital market permies.com pie forums private forums all forums
this forum made possible by our volunteer staff, including ...
master stewards:
  • Carla Burke
  • John F Dean
  • Timothy Norton
  • Nancy Reading
  • r ranson
  • Jay Angler
  • Pearl Sutton
stewards:
  • paul wheaton
  • Tereza Okava
  • Andrés Bernal
master gardeners:
  • Christopher Weeks
gardeners:
  • Jeremy VanGelder
  • M Ljin
  • Matt McSpadden

Well Sand Point

 
Posts: 1
  • Likes 2
  • Mark post as helpful
  • send pies
    Number of slices to send:
    Optional 'thank-you' note:
  • Quote
  • Report post to moderator
I am going to be sinking a new sand point this weekend. The existing sand point quit working.
I can pour water down the old pipe and it will go down very slowly. If my thinking is correct, where it stops should be the top of the water table. When I drive the new point, am I supposed to just stop once the top of the point is under water? The old well was hooked up with some flexible pipe and has some splices in it so I was going to leave it down and just relocate the new one closer to the house so I can just hard  pipe it all of the way to the pump. My thinking is to measure the old one and sink the new one to the same depth. But how do I know when I hit the optimal depth? I have seen videos on YouTube that say, put water in the pipe and it should exit as fast as I put it in.
 
steward
Posts: 17501
Location: USDA Zone 8a
4466
dog hunting food preservation cooking bee greening the desert
  • Likes 5
  • Mark post as helpful
  • send pies
    Number of slices to send:
    Optional 'thank-you' note:
  • Quote
  • Report post to moderator
Welcome to the forum.  Sorry to hear you are having well problems.  I am sorry to hear that.

I wish you the best.
 
steward
Posts: 15825
Location: Northern WI (zone 4)
5011
8
hunting trees books food preservation solar woodworking
  • Likes 4
  • Mark post as helpful
  • send pies
    Number of slices to send:
    Optional 'thank-you' note:
  • Quote
  • Report post to moderator
Most sand points I've seen have a 3 or 4 foot screen area where the water comes in.  That all needs to be under water.  So I'd aim to have the top of the screened part be under the water table by at least a couple feet.  I don't know what the official recommendation is though.
 
master steward
Posts: 7634
Location: southern Illinois, USA
2819
goat cat dog chicken composting toilet food preservation pig solar wood heat homestead composting
  • Likes 3
  • Mark post as helpful
  • send pies
    Number of slices to send:
    Optional 'thank-you' note:
  • Quote
  • Report post to moderator
I don’t know if anything is official with a standpoint.   I have had people tell me to be happy when I hit water. Others have told me to take it down a few more feet. And others have told me to drive through the first vein of water until the second one is hit ( sounds pretty optimistic). My one experience with driving a sandpoint involved 3 of us taking turns for the better part of a day.   That was in the mid 80’s,so I don’t remember many specifics.
 
I got this tall by not having enough crisco in my diet as a kid. This ad looks like it had plenty of shortening:
Learn Permaculture through a little hard work
https://wheaton-labs.com/bootcamp
reply
    Bookmark Topic Watch Topic
  • New Topic