BEL #845
Significant progress to report today on the stewardship acre.
To sum it up: the roof frame is attached! Now I'll work on the door.
When I visited the site yesterday, I disconnected the tarp from the frame, and then re-strung everything. I went from corner-to-corner for both the tarp and the canvas.
I realized the canvas didn't have any grommets, so instead I grabbed a rock...
...and tied it into a bundle at each corner, like this:
I'll eventually do the rest of the grommets on the tarp, tying them to rock bundles on the opposite edge. For now, the roof cover looks like this from the underside:
The frame requires that the roundwood roof frame is somehow connected securely to the dimensional lumber building frame. So I started by chiseling-in deep notches on the underside of each of the roundwood supports that would attach to the building.
A drawknife was used to smooth the roundwood to a flat surface, allowing maximum purchase and a flush fit between the roof frame and the building frame.
At this point I most definitely want to send thanks and kudos to fellow Boot,
Erik, who joined me up at the stewardship acre today. I also appreciate
Paul allowing
Boots to join me for some time each week to help with tasks on the stewardship acre.
Here's Erik draw-knifing one of the roundwood roof supports.
If Erik wasn't here with me, then the next photo wouldn't have been possible. Between me standing on the building frame, and Erik standing on the ladder, we both managed to lift and maneuver the roof frame into place and secure it. The construction screws we used helped pull the pieces together and ensure a snug fit.
In general, this is a major step forward in terms of building-construction progress. It's been a long day, but this was a fitting end that put me in good spirits and helped me feel accomplished.
That's all for now. Thanks for reading, and enjoy your day...!
