This is a badge bit (BB) that is part of the
PEP curriculum. Completing this BB is part of getting the sand badge in
earthworks.
We are going to add a tiny bit of edge in your landscape. A very small
pond that will probably fill up with "stuff" and disappear in a few years - but that little bit of diversity will remain for decades.
You will build and seal a very small
pond. Very, very small. Stupid small. But easy! Very, very easy. And small. And sealed!
There are several ways to make a pond hold water. For this BB, we will emulate a pig wallowing and the hooves compacting.
To get your creative juices flowing, here's compacting with feet and water at the Krameterhof:
Here's Josiah earning the BB:
Make a hole in the ground that is 2 feet in diameter and at least a foot deep.
- Pour in 5 gallons of water and prove that the water is gone in less than 60 minutes
- Compact the soil (probably with different kinds of digging bars, or a piece of rebar stabbed into the hole a hundred times)
- Repeat the 5 gallon test with water remaining for at least an hour
To get certified for this BB, post the following as pictures or video (<2 min):
- Show the new hole
- Show how long it took to drain 5 gallons
- Show the compaction process
- Show the new 5 gallons going in
- Show a toothpick marking the water line once the water is in
- Show that the water level has not dropped more than a half inch in an hour